S-BMS C4DI Northallerton
Case Study

Project Overview

Our latest case study shows what makes S-BMS different — putting installation and control back into the hands of the M&E contractor, without needing a specialist BMS integrator.

At the C4DI Innovation Centre in Northallerton (a live co-working hub managed by North Yorkshire Council), the M&E team needed to:

  • Achieve precise temperature control for tenants
  • Retrofit the system without disruption or rewiring
  • Keep installation costs under control

Instead of using a traditional BMS integrator, the M&E contractor installed the full S-BMS system themselves — after just one training session. Because all S-BMS wiring diagrams are electrician-friendly and pre-engineered, the team completed the retrofit quickly and efficiently.

The result

  • 50% lower installation cost compared to the BMS integrator’s quote
  • No disruption to building operations
  • Full system control and Part L compliance
  • Simplified commissioning and ongoing flexibility for the M&E team

You can see a short video of the project on the right or download the full case study by filling out the form.

Download the Full Case Study

explore how S-BMS can help your team deliver similar results — cutting BMS complexity and costs while keeping control in-house