S-BMS C4DI Northallerton
Case Study
Project Overview
Our latest case study shows what makes S-BMS different — putting installation and control back into the hands of the M&E contractor, without needing a specialist BMS integrator.
At the C4DI Innovation Centre in Northallerton (a live co-working hub managed by North Yorkshire Council), the M&E team needed to:
- Achieve precise temperature control for tenants
- Retrofit the system without disruption or rewiring
- Keep installation costs under control
Instead of using a traditional BMS integrator, the M&E contractor installed the full S-BMS system themselves — after just one training session. Because all S-BMS wiring diagrams are electrician-friendly and pre-engineered, the team completed the retrofit quickly and efficiently.
The result
- 50% lower installation cost compared to the BMS integrator’s quote
- No disruption to building operations
- Full system control and Part L compliance
- Simplified commissioning and ongoing flexibility for the M&E team
You can see a short video of the project on the right or download the full case study by filling out the form.